April 09, 2024

Three near-term restoration and improvement projects that await funding

Recently I was asked which of our planned projects might be suitable for a donor who wished to honor the memory of a loved one. Given the impression that the contemplated size of the gift was between $1K and $10K, I came up with three options. 

Below the jump, I describe these options. Each one appeals to a certain sensibility. All of them would help to meet a pressing need—and boost the spirits of our members and staff.


Provide durable shade for the play yard

(As usual, click/tap on an image to enlarge it.)

Our current shade umbrellas do not properly shade the 24 active children in our preschool. Furthermore, they break easily and pose something of a tripping hazard. We need large sails that cover the yard up above, to allow for some sun to peek through yet mostly give shade. The material would be durable, and the sails would be removable only on special occasions (such as Sukkot).

Estimated cost for de­sign, fabri­cation, and installation: $1–3K.


Rehabilitate the women’s restroom off the lobby 

Our women’s restroom reflects the synagogue’s limited financial means after World War II. Its stalls are tiny, and its wall tiles are factory “seconds” that were less expensive than regular ones. While respecting the his­torically significant aspect, we need at least one large stall that can accommodate a wheelchair, and a less cramped feel overall. 

Estimated cost for refurbishing the restroom: $40K. 

Many members have expressed eagerness for this rehabilitation project, yet a challenge-match donation is needed to galvanize that energy.


Waterproof the front façade and steps

The most urgent need for the integrity of our building envelope is to stop the ongoing water intrusion through the front stucco and the flagstone steps. Deteriora­tion is increasing with every heavy rainfall. Applying a top-grade elastomeric coating will also restore a uniform and pleasing appearance to the façade, akin to its original color. 

Estimated cost for patching and coating these surfaces: $28K. 

The board has authorized this rehabilitation project; our Historic Structure Report called it a high-priority action item already in 2003 (“add waterproofing at the west elevation to reduce moisture infiltration at the concrete substructure”), for seismic integrity. Now a challenge-match donation is needed to attract the necessary funds.