April 08, 2025

Security/shade covering for play yard: Best design and bid identified (Activity Report)

OUR PLAY YARD is used for many types of activities: as the preschool’s primary outdoor space, as a venue for Shabbat dinners, as the site of our annual sukkah, as the entryway into our sanctuary for wheelchair users, and more. Whatever approach to a security/shade covering that we install to protect the yard, it needs to be flexible enough to allow for all of those uses. It also needs to be durable, because equipment with a short lifespan is a hassle for our busy staff to deal with.

Awning at the Shalom School in Sacramento

That is why we are going with a slide-wire awning design, from a manufacturer of reliably durable products. 

Yet flexibility and durability do not come cheap. Which is why we now need to raise some donated funds above and beyond the amount of the Federation grant that we were awarded last year.

Below the jump, this post describes the selected design and the winning bid.…

April 06, 2025

Air purifier selected for school building (Activity Report)

WE HAVE SELECTED the most appropriate air purification device for our school/office building. It is a NuShield-R, which is a compact unit—smaller than a cigar box. It uses needlepoint bipolar ionization (NBPI) technology.

It appears that we can count on the impending air scrubber to significantly reduce the airborne transmission of disease inside our school building — as long as the hallway doors are kept ajar, so that the air can keep circulating throughout the building.

Below the jump, this post explains this unit’s benefits and features.

A plan for entry accessibility (Speculation)

GETTING IN AND OUT of our historic sanctuary building cannot be done according to either the normal building code or the more lenient state historic building code, unfortunately. Yet surely our impending restroom expansion will trigger a review of the building’s entry accessibility. This topic must be addressed before we can proceed with that larger project. Therefore I have been working toward a draft plan for entry accessibility, while discussing the topic with several architects.

Ultimately, such a plan will need to be formally developed by an architect of record. However, I find that our building poses certain constraints that will inevitably guide that plan. Below the jump, this post discusses those constraints, and the remaining options.

Water intrusion continues in SW column (Activity/Condition Report)

THE ROOFER CAME on March 6 and patched a number of small cracks and other openings that were discovered in the flashing on the roof. This work was done under warranty. Yet the water intrusion into the portico’s southwest column continued during the most recent rainstorms at the end of March.

Below the jump, this post documents both the repair and the continuing damage.

April 02, 2025

Historically significant features of our main-floor restrooms/lobby (Condition Report)

CHARACTER-DEFINING FEATURES of our historic sanctuary building were identified in the Historic Structure Report (2003; “HSR”). These are the aspects that warrant historic preservation, in the eyes of architectural historians.


Below the jump, this post excerpts from here and there the HSR to describe and list the historically significant features in the four spaces that have been assigned the highest priority for rehabilitation/renovation. As named in the HSR, those spaces are known as the ladies’ lounge, ladies’ restroom, men’s restroom, and the narthex (lobby)

Report of the Ad Hoc Committee on Capital Priorities, as submitted 2/3/25 (Activity Report)

THE COMMITTEE WAS ASKED to provide the Board a list of priorities for the use of funds currently held in the Mishkon Tephilo Capital Improvements Fund (at Morgan Stanley). The committee was informed that approximately $400,000 was deposited into this fund from proceeds of the sale of the Powerhouse property and the bequest of Larry Kasdon.

(So begins the report. Below the jump, the remainder is given verbatim.…)