Showing posts with label Stucco. Show all posts
Showing posts with label Stucco. Show all posts

December 04, 2024

West wall of school building receives maintenance (Activity Report)

AS A FOLLOW-UP to my having noted in October the maintenance need HERE, I am pleased to record that our Director of Operations has arranged to have this wall painted, as part of a larger project in November. 

(As usual, click/tap on an image to enlarge it.)

The quick turnaround is heartening. (Sometimes things do come together nicely!)

Below the jump, this short post documents the wall’s current condition via photos. They are meant to be compared directly with those in the previous post.

December 03, 2024

Front façade water intrusion repair and prevention (Completion Report)

THIS PROJECT was completed last month. It features several historically significant components of our sanctuary building’s façade. Therefore this post follows a report template in the 2003 Historic Structure Report, as recommended for all historic-cultural monuments. 


(As usual, click/tap on an image to enlarge it.)

Below the jump, this post restates the basic need and documents the work done. For more background, see HERE.…

October 31, 2024

West wall of school building needs maintenance (Condition Record)

LAST PAINTED IN 2007, which was 17 years ago, the west wall of our school building is in need of a little lovin’. In retrospect, it should have been repainted a decade ago. 

(As usual, click/tap on an image to enlarge it.)

This wall has been neglected because almost nobody except the staff ever sees it. Meanwhile, the afternoon sun and sea breezes have taken their toll.

Below the jump, this short post documents the wall’s current condition, with three annotated photos.

January 29, 2024

Why is this section of the south wall different from the others?

THE TITLE of this post is a sincere question that is being posed to our waterproofing contractor, Cameron Figgins of Absolute Maintenance & Consulting. My focus here is on the concrete stem wall (also known as the foundation wall), which juts out along the bottom of the overall exterior wall.

Why does the section on the right of the pilaster
look so different from the one on the left?
(As usual, click/tap on an image to enlarge it.)

My concern is not aesthetics but rather that the rightmost section seems less well protected from future water intrusion.

I’ve been wanting to pose that title question in person since mid-August, but I haven’t succeeded in meeting up with Cameron on site. So last week, I asked him via email. He promptly replied:

Please send me something from a few different angles. I'm really interested to see what you're talking about here, see what you might mean.  

In response, I am uploading photos to this post. Below the jump break, I document how the easternmost section of our wall looks markedly different from the other sections. 

November 09, 2023

Waterproofing the façade on Main Street

THE BASIC PLAN for restoring the sanctuary building’s façade and eliminating water intrusion is outlined in this post. (The condition of the walls is documented in photographs HERE.)

(As usual, click/tap on an image to enlarge it.)

Maintenance needs for the south wall

AFTER I ASKED our waterproofing contractor for guidance regarding proper maintenance for the newly waterproofed south wall (completion expected tomorrow), I received the following response on October 24.

  • The company head will come out soon to inspect the job, to see if there is anything that needs to be touched up, which will be done within the first three months.
  • Based upon the conditions that he finds, he will then propose a maintenance schedule.
  • The first maintenance pass will occur 9–12 months after completion of the job. 
  • Maintenance costs are covered for the first year, as part of the waterproofing contract. (However, any physical damage from cars, trash cans, or otherwise is not covered. Nor is building movement, cracking, or any settling of the newly replaced post.)

October 31, 2023

Condition of the Main Street façade

THE SANCTUARY BUILDING façade on Main Street is due for restoration, given the longstanding water intrusion in the hallway. The same kind of problems that we found at the south wall are increasingly evident. They seem to be the result of two of the 1948 construction methods — namely, the lack of a weep screed and of a waterproof coating for the above-ground portion of the concrete foundation.

We know basically what needs to be done. Now it’s a matter of gathering the necessary funds, completing a contract, and arranging the logistics of the restoration work.

Below the jump, this post documents the present condition of the walls, via photographs. (As usual, click/tap on an image to enlarge it.)

July 21, 2023

South wall exterior: Cleaning and maintenance instructions

From the Technical Data Sheet and the Application and Maintenance Guide for Dow Corning AllGuard Silicone Elastomeric Coating…

June 27, 2023

Repairing a termite-infested load-bearing wooden post

ON JUNE 12, we learned that the wooden post inside our most weather-exposed pilaster is thoroughly infested with termites, resulting in significant damage. This is the same post that we have already treated twice in its bottom 2 feet for termites, both from the inside and the outside. But now we know that they have been active almost all the way to the top, at least on the outside. 

Jim Farasatpour, an experienced structural engineer, has examined the outside, and he believes that this post can be repaired for about $5000. (There is a small chance that it might need to be replaced, but we won’t know for sure until we actually set about to make the repair.) We believe that this repair effort can be made concurrently with the waterproofing project. It is essential, due to the post’s structural importance.

As a safety issue, our synagogue leadership considers this repair effort to be a high priority. 

Below the jump, this post outlines what that repair effort will involve.… 

May 28, 2023

Vertical cracks along and above the south wall’s pilasters

VERTICAL CRACKING in the stucco of our pilasters might be merely a rupture in the stucco itself—without having compromised the tar paper (vapor barrier) behind the stucco. On the other hand, as a structural engineer told me today, it could be the opening for a serious structural issue to have developed: dry rot in the post, due to persistent moisture intrusion.   

(As usual, click/tap on an image, to enlarge it.)

It’s like when a car’s owner finds that one of its tires looks almost flat. Can that tire be patched—or does it need to be replaced? Well, it needs further inspection. Similarly in our case, the best way to find out what we are dealing with is: chip open a couple of the cracks, to see how deep they go. 

Below the jump, this post looks more closely at the newly noticed cracks, and our options.…

March 30, 2023

Showing our true colors: Painting choices

WE ARE GETTING CLOSE to applying new surface finishes to our sanctuary’s outer south wall, and to our main sanctuary hall. Which leads to a question: What should their surface colors be?


Below the jump, this post discusses both surfaces—exterior and interior.

March 10, 2023

Temporary protection for the south wall

UNTIL THE WALL is waterproofed, water damage will continue whenever it rains. And it will get worse over time, as the wall continues to degrade. 

This post documents a couple of temporary measures that I have been taking to protect the interior of our sanctuary building. 

I’m proceeding according to the “ounce of prevention is worth a pound of cure” principle. (The down side is that these measures reduced my availability for other B&G responsibilities.)

February 13, 2023

Exposure of 3 pilaster bases shows corroded rebar due to moisture intrusion

THIS POST documents the condition of the newly exposed pilaster bases, on the south wall of the sanctuary. I provisionally interpret the findings as evidence of damage due to longstanding water intrusion — but not threatening the stability of the building itself. The structural engineer seems to agree with this assessment, but I believe he is withholding final judgment until he makes an on-site visit.

Here is a map of the south wall, showing which 3 of the 7 pilasters are involved. The labels “1st,” “2nd,” and “3rd” refer to the order in which the structural engineer and I have attended to them, rather than their position on the wall.

(As usual, click/tap on an image to enlarge it.)

Below the jump, I recap the uncovering process, and then show a set of photos for each base.…

January 29, 2023

South wall: Opinion of a stucco repair contractor

TODAY I MET outside the south wall with Brian James, who works for a stucco repair contractor. He has 17 years of experience in dealing with aging and decrepit stucco surfaces in the L.A. area. While awaiting his bid for restoration, I will write up what I learned from our conversation.…

(As usual, click/tap on an image to enlarge it.)

January 19, 2023

Board authorizes south wall projects

LAST NIGHT, the board of directors approved an enabling resolution stating that two related B&G projects should be undertaken as reserve funds become available. 

  • Repair and waterproof the exterior south wall of the sanctuary
  • Repair the damaged pilaster base on that wall

Expenditures of up to a certain stated amount* were authorized, provided that the usual procurement procedures are followed. Due to the uncertain nature of working on poorly maintained older buildings, an allowance for contingency was included.

Already the funds equal to the authorized amount are either in the Capital Improvements Fund, or verbally committed by donors specifically for these projects.

So the ball is now back in the court of the B&G Committee, for the execution of these projects.



*I prefer not to post the total authorized amount online until our vendor negotiations are completed.

 

January 10, 2023

South wall: Deferred maintenance makes revealing patterns

IMMEDIATELY AFTER a heavy rain, the stucco wall looks quite different than usual. Apparently the many places where moisture enters the stucco become easy to see. Those are the darker (wet) spots and lines that stand out against the lighter (drier) areas.

(As usual, click/tap on a photo to enlarge it.)

In other words, the dark patches are where the surface is readily admitting moisture into the wall.

Below the jump, this post documents the water-intrusion situation in a new way.…

January 09, 2023

More issues with pilaster bases at the south wall

THIS POST provides clear evidence that water is getting through the wall from outside, and that the stem wall is getting overly wet in even more places that have structural implications.

December 1st — baseline for comparison
(As usual, click/tap on a photo to enlarge it.)

December 1st — exposed base of post — baseline for comparison

December 12, 2022

Avoiding a Pilaster Disaster

A PILASTER IS “an upright architectural member that is rectangular in plan and… usually projects one third of its width or less from the wall, and that may be load-bearing” (Merriam-Webster’s). I.e., it’s a rectangular pillar or post that sticks out from a wall

Our sanctuary’s south wall has 7 load-bearing pilasters. And in July I learned that the base of one of them was visibly damaged, as described HERE and HERE. Because of the structural importance of the pilaster, this damage is turning out to be a significant problem.

Damaged base of pilaster, as seen in July
(As usual, click/tap on a photo to enlarge it.)

This blog post discusses the challenges involved in repairing this pilaster base.

December 02, 2022

South Wall Discovery Project: Initial Report

ON THREE OCCASIONS during the past two decades, structural engineers have recommended that we do test cuts into the south wall of our sanctuary. The goal: to enable more reliable cost estimates for waterproofing and possible structural repair work, hopefully later this year. Given more than two decades of known water intrusion and termite activity in that area, the engineers were concerned that there might be significant structural damage in the wall. They told us that there was only one way to find out: to look beneath the plaster surface.

Prep work, as viewed from bimah:
Marking the locations, and placing air purifiers to catch plaster dust.
(As usual, click/tap on a photo to enlarge it.)

This past week, we finally undertook that adventure in discovery. Although the board had approved this work in May 2021, it took until now to arrange for the proper alignment of funding and expertise. Careful planning (described HERE) was needed to ensure that we would get useful and reliable answers to our questions, given our limited budget. 

This post reports on what was done, and the initial findings.

October 17, 2022

South Wall: Incremental Steps toward Test Cuts (rev. 11/13)

MAKING TEST CUTS into the south wall will be an adventure in discovery. (Best case: we find that the wall’s structural integrity is in good shape. Worst case: we find that there’s significant structural damage due to water damage, dry rot, termites; and maybe there’s mold, as well.) The point of this exercise is to be able to develop reliable cost estimates for structural repair and waterproofing later this year. 

There are many issues to consider in advance, in order to ensure that we get useful and reliable answers to our questions. To me, the pending discovery stage feels a bit like sending an unmanned mission to Mars—we’ve got to get it right long before the probe lands on the unexplored surface of interest.

An American probe sent to Mars

Below the jump, this post discusses the various considerations.…